Track the regulatory record behind the data-center power buildout.
Data centers are the fastest-growing force in US power markets — driving about 40% of PJM's ~$16.4 billion December 2025 capacity cost (per PJM's Independent Market Monitor) and flooding ERCOT's large-load interconnection queue. NodalPulse tracks the PUCT, ERCOT, PJM and FERC dockets behind it — large-load interconnection, cost allocation, and tariffs — with deadlines and party positions extracted, threaded across jurisdictions, and cited to the filing.
14-day free trial · No card required · Cancel anytime
Why this is the story of the decade in power.
The dollars are decided in dockets — who pays for the buildout, how large loads interconnect, and which tariffs apply. Miss a comment window or an effective date and the outcome is set without you.
What NodalPulse tracks for data-center & large-load matters
ERCOT large-load interconnection rules.
NPRRs, PGRRs, and PUCT proceedings that reshape large-load queue priority, study requirements, and cost responsibility — with the comment and effective-date deadlines pulled out and put on your radar.
Large-load tariffs & cost allocation.
The state and ISO proceedings that decide who pays for the buildout — new large-load rate classes, minimum-take provisions, and cost-allocation methods — with party positions structured, not paraphrased.
PJM capacity & the data-center cost fight.
RPM auction parameters and the Independent Market Monitor's data-center analysis — the numeric guts, not just the headline — so you can trace the $/MW-day exposure to your zone.
The FERC layer, threaded in.
Large-load matters in the FERC-jurisdictional markets pull in their FERC ER/EL dockets automatically — connected to the ISO and state legs so the matter reads as one story, not four disconnected searches.
One data-center matter. Four venues. No shared ID.
A large-load interconnection fight rarely lives in one place: an ERCOT protocol revision runs alongside a PUCT tariff docket, while a parallel matter in PJM becomes a FERC filing — none of them sharing a docket number. Tracking it by hand means four portals and a spreadsheet that's stale by lunch.
NodalPulse connects the legs into one living Record page per matter, so a change in any venue surfaces in context — with the deadline, the parties, and the citation back to the filing it came from.
Data-center power regulation: common questions
How are data centers affecting electricity prices and power markets?
Where are data-center power regulations actually decided?
What is ERCOT large-load interconnection (and "Batch Zero")?
How do I track data-center and large-load energy dockets across states and ISOs?
Track the dockets shaping the data-center buildout.
ERCOT and California live · PJM in Beta · FERC layer threaded in. Start free — no card.